TURN-KEY PROJECTS
For the project as whole as well as its stages
the customer can pick any combination of works
and services offered by Argus Group.

Technologies and Equipment Introduced by Argus to the Russian Market

Наши Внедрения / Our Integrations

2009 Automatic welding control systems
2007 Double joint pipe welding yard combining the advantages of STT welding as well as submerged arc welding using the PowerWave AC/DC 1000
2006 Full set of welding materials for the ESPO project
2005 Automated submerged arc welding systems such as the PowerWave AC/DC 1000
2004 Automated application of multi-component liquid pipe coatings on the right-of-way
1999 M300 automatic welding system with gas metal arc welding
1997 STT + WaveformControl technology
1996 18P specialized electrodes with increased productivity in welding high-strength steel pipes
1995 Clock Spring repair sleeves
1994 Automated coating rehabilitation systems
16P specialized electrodes for pipe welding;
Widespread application of automatic girth welding of pipe
1993 Flux-core welding wire and equipment

©2010 Argus Group; All rights reserved!